| tar_progress_branches {targets} | R Documentation |
Tabulate the progress of dynamic branches.
Description
Read a project's target progress data for the most recent run of the pipeline and display the tabulated status of dynamic branches. Only the most recent record is shown.
Usage
tar_progress_branches(
names = NULL,
fields = NULL,
store = targets::tar_config_get("store")
)
Arguments
names |
Optional, names of the targets. If supplied, |
fields |
Optional, names of progress data columns to read.
Set to |
store |
Character of length 1, path to the
|
Value
A data frame with one row per target per progress status and the following columns.
-
name: name of the pattern. -
progress: progress status:"dispatched","completed","cancelled", or"errored". -
branches: number of branches in the progress category. -
total: total number of branches planned for the whole pattern. Values within the same pattern should all be equal.
See Also
Other progress:
tar_canceled(),
tar_completed(),
tar_dispatched(),
tar_errored(),
tar_poll(),
tar_progress(),
tar_progress_summary(),
tar_skipped(),
tar_watch(),
tar_watch_server(),
tar_watch_ui()
Examples
if (identical(Sys.getenv("TAR_EXAMPLES"), "true")) { # for CRAN
tar_dir({ # tar_dir() runs code from a temp dir for CRAN.
tar_script({
list(
tar_target(x, seq_len(2)),
tar_target(y, x, pattern = map(x)),
tar_target(z, stopifnot(y < 1.5), pattern = map(y))
)
}, ask = FALSE)
try(tar_make())
tar_progress_branches()
})
}