as.aweek {aweek}R Documentation

Convert characters or dates to aweek objects

Description

Convert characters or dates to aweek objects

Usage

as.aweek(x, week_start = get_week_start(), ...)

## Default S3 method:
as.aweek(x, week_start = NULL, ...)

## S3 method for class ''NULL''
as.aweek(x, week_start = NULL, ...)

## S3 method for class 'character'
as.aweek(x, week_start = get_week_start(), start = week_start, ...)

## S3 method for class 'factor'
as.aweek(x, week_start = get_week_start(), ...)

## S3 method for class 'Date'
as.aweek(x, week_start = get_week_start(), ...)

## S3 method for class 'POSIXt'
as.aweek(x, week_start = get_week_start(), ...)

## S3 method for class 'aweek'
as.aweek(x, week_start = NULL, ...)

Arguments

x

a Date, POSIXct, POSIXlt, or a correctly formatted (YYYY-Www-d) character string that represents the year, week, and weekday.

week_start

a number indicating the start of the week based on the ISO 8601 standard from 1 to 7 where 1 = Monday OR an abbreviation of the weekdate in an English or current locale. Note: using a non-English locale may render your code non-portable. Defaults to the value of get_week_start()

...

arguments passed on to date2week() and as.POSIXlt()

start

an integer (or character) vector of days that the weeks start on for each corresponding week. Defaults to the value of get_week_start(). Note that these will not determine the final week.

Details

The as.aweek() will coerce character, dates, and datetime objects to aweek objects. Dates are trivial to convert to weeks because there is only one correct way to convert them with any given week_start.

There is a bit of nuance to be aware of when converting characters to aweek objects:

Value

an aweek object

Note

factors are first converted to characters before they are converted to aweek objects.

See Also

"aweek-class" for details on the aweek object, get_aweek() for converting numeric weeks to weeks or dates, date2week() for converting dates to weeks, week2date() for converting weeks to dates.

Examples


# aweek objects can only be created from valid weeks:

as.aweek("2018-W10-5", week_start = 7) # works!
try(as.aweek("2018-10-5", week_start = 7)) # doesn't work :(

# you can also convert dates or datetimes
as.aweek(Sys.Date())
as.aweek(Sys.time())

# all functions get passed to date2week, so you can use any of its arguments:
as.aweek("2018-W10-5", week_start = 7, floor_day = TRUE, factor = TRUE) 
as.aweek(as.Date("2018-03-09"), floor_day = TRUE, factor = TRUE)

# If you have a character vector where different elements begin on different
# days of the week, you can use the "start" argument to ensure they are
# correctly converted.
as.aweek(c(mon = "2018-W10-1", tue = "2018-W10-1"), 
         week_start = "Monday", 
         start = c("Monday", "Tuesday"))

# you can convert aweek objects to aweek objects:
x <- get_aweek()
as.aweek(x)
as.aweek(x, week_start = 7)

[Package aweek version 1.0.3 Index]