as.aweek {aweek} | R Documentation |
Convert characters or dates to aweek objects
Description
Convert characters or dates to aweek objects
Usage
as.aweek(x, week_start = get_week_start(), ...)
## Default S3 method:
as.aweek(x, week_start = NULL, ...)
## S3 method for class ''NULL''
as.aweek(x, week_start = NULL, ...)
## S3 method for class 'character'
as.aweek(x, week_start = get_week_start(), start = week_start, ...)
## S3 method for class 'factor'
as.aweek(x, week_start = get_week_start(), ...)
## S3 method for class 'Date'
as.aweek(x, week_start = get_week_start(), ...)
## S3 method for class 'POSIXt'
as.aweek(x, week_start = get_week_start(), ...)
## S3 method for class 'aweek'
as.aweek(x, week_start = NULL, ...)
Arguments
x |
a Date, POSIXct, POSIXlt, or a correctly formatted (YYYY-Www-d) character string that represents the year, week, and weekday. |
week_start |
a number indicating the start of the week based on the ISO
8601 standard from 1 to 7 where 1 = Monday OR an abbreviation of the
weekdate in an English or current locale. Note: using a non-English locale
may render your code non-portable. Defaults to the value of
|
... |
arguments passed on to |
start |
an integer (or character) vector of days that the weeks
start on for each corresponding week. Defaults to the value of
|
Details
The as.aweek()
will coerce character, dates, and datetime objects
to aweek objects. Dates are trivial to convert to weeks because there is
only one correct way to convert them with any given week_start
.
There is a bit of nuance to be aware of when converting characters to aweek objects:
The characters must be correctly formatted as
YYYY-Www-d
, where YYYY is the year relative to the week, Www is the week number (ww) prepended by a W, and d (optional) is the day of the week from 1 to 7 where 1 represents the week_start. This means that characters formatted as dates will be rejected.By default, the
week_start
andstart
parameters are identical. If your data contains heterogeneous weeks (e.g. some dates will have the week start on Monday and some will have the week start on Sunday), then you should use thestart
parameter to reflect this. Internally, the weeks will first be converted to dates with their respective starts and then converted back to weeks, unified under theweek_start
parameter.
Value
an aweek object
Note
factors are first converted to characters before they are converted to aweek objects.
See Also
"aweek-class" for details on the aweek object,
get_aweek()
for converting numeric weeks to weeks or dates,
date2week()
for converting dates to weeks, week2date()
for converting
weeks to dates.
Examples
# aweek objects can only be created from valid weeks:
as.aweek("2018-W10-5", week_start = 7) # works!
try(as.aweek("2018-10-5", week_start = 7)) # doesn't work :(
# you can also convert dates or datetimes
as.aweek(Sys.Date())
as.aweek(Sys.time())
# all functions get passed to date2week, so you can use any of its arguments:
as.aweek("2018-W10-5", week_start = 7, floor_day = TRUE, factor = TRUE)
as.aweek(as.Date("2018-03-09"), floor_day = TRUE, factor = TRUE)
# If you have a character vector where different elements begin on different
# days of the week, you can use the "start" argument to ensure they are
# correctly converted.
as.aweek(c(mon = "2018-W10-1", tue = "2018-W10-1"),
week_start = "Monday",
start = c("Monday", "Tuesday"))
# you can convert aweek objects to aweek objects:
x <- get_aweek()
as.aweek(x)
as.aweek(x, week_start = 7)