| alma_seq {almanac} | R Documentation |
Generate date sequences
Description
alma_seq() generates a sequence of all dates between from and to,
skipping any events defined by the rschedule.
Usage
alma_seq(from, to, rschedule, inclusive = TRUE)
Arguments
from, to |
Dates defining the range to look for events. |
rschedule |
An rschedule, such as an rrule, runion, rintersect, or rsetdiff. |
inclusive |
If |
Value
A vector of dates in the range of [from, to], with all events in the
rschedule removed.
Examples
on_weekends <- weekly() %>% recur_on_weekends()
# Generate a sequence of all non-weekend dates in Jan-2000
alma_seq("2000-01-01", "2000-01-31", on_weekends)
[Package almanac version 1.0.0 Index]