PhaseDurationPlot {RChronoModel} | R Documentation |
Plot of the marginal posterior densities of the duration of a phase
Description
This function draws the marginal posterior densities of the time elapsed between the minimum and the maximum of the dates included in a phase, and adds summary statistics (mean, CI)
Usage
PhaseDurationPlot(PhaseMin_chain, PhaseMax_chain, level=0.95,
title = "Duration of the phase", colors = T, GridLength=1024)
Arguments
PhaseMin_chain |
numeric vector containing the output of the MCMC algorithm for the minimum of the dates included in the phase |
PhaseMax_chain |
numeric vector containing the output of the MCMC algorithm for the maximum of the dates included in the phase |
level |
probability corresponding to the level of confidence used for the credible interval and the time range |
title |
title of the graph |
colors |
if TRUE -> use of colors in the graph |
GridLength |
length of the grid used to estimate the density |
Value
A plot with the marginal posterior densities of the duration of a phase and adds several summary statistics (mean, Credible interval, Time range)
Author(s)
Anne Philippe <Anne.Philippe@univ-nantes.fr> and
Marie-Anne Vibet <Marie-Anne.Vibet@univ-nantes.fr>
Examples
data(Phases); attach(Phases)
PhaseDurationPlot(Phase.1.alpha, Phase.1.beta, 0.95, "Duration of Phase 1")
PhaseDurationPlot(Phase.2.alpha, Phase.2.beta, 0.95, "Duration of Phase 2",colors = FALSE)