GBload {tsrobprep} | R Documentation |
The electricity actual total load in Great Britain in year 2018
Description
A dataset containing the electricity actual total load (MW) in Great Britain in year 2018 presented in half-hour interval. Each data point regards 30 minutes of electricity load starting at given time. The data consists of both missing values and outliers.
Usage
GBload
Format
A data frame with 17520 rows and 2 variables:
- Date
date indicating the delivery beginning of the electricity
- Load
actual electricity load in MW
...
Source
https://transparency.entsoe.eu/
[Package tsrobprep version 0.3.2 Index]