progress_ring_percent {switchboard} | R Documentation |
Display a progress ring and a percent complete.
Description
The progress_ring_percent
widget displays an ring/circle progress bar
along with the percent complete.
Arguments
eavesdrop |
The variable to track with a progress bar. |
maximum |
The maximum value of |
label |
A small caption/label for the widget. |
size |
A number used to designate the size (magnification) of the
widget. The default is set to |
placeOnGrid |
A row by column coordinate (e.g., |
updates |
The number of times the widget is to be updated (e.g., when it be modified/changed). The default updates the widget 100 times. Increase number for smoother progress bar animation. |
delay |
Pause each update of the switchboard. Default has no delay,
values are in seconds (e.g., |
honest |
When |
closeAtMaximum |
Functions like |
Value
Nothing.
Usage
progress_ring_percent(eavesdrop, maximum = 100, caption = "", size = 1, placeOnGrid = c(1, 1), updates = 100, delay = 0, honest = FALSE, closeAtMaximum = FALSE)
See Also
Other progress bars:
progress_benchmark()
,
progress_ibis()
,
progress_image()
,
progress_oyster()
,
progress_percent()
,
progress_phyllotaxis()
,
progress_pikachu()
,
progress_ring()
Examples
## Not run:
for (i in 1:250) {
switchboard(delay = 0.01) %>%
progress_ring_percent(i, maximum = 250)
}
switchboard_close()
## End(Not run)