eventWeek {interim} | R Documentation |
Scheduling interim analyses in clinical trials in a time-to-event setting
Description
Function eventWeek
determines the week of the trial in which a certain number t
of events occured.
Usage
eventWeek(t, p)
Arguments
t |
result of function |
p |
number of events for which the week shall be determined. |
Details
eventWeek
is an auxilliary function required to assess the timing of interim analyses. It derives
the week of trial in which a certain number of events occured.
The output is required for function cross
, which includes the information into an existing Event diagram.
Value
The week in which the number of events is reached.
See Also
cross
for plotting results of function eventWeek
into an existing Event diagram.
Examples
x=recruitment(nc=Inf,ns=Inf,cw=4,sw=2,sf=0.3,tb=4,en=400)
x=recruitment(nc=Inf,ns=Inf,cw=4,sw=2,sf=0.3,tb=4,en=400)
y=treatment(r=x,dr=0.08,du=50)
eventCourse(r=x,e1=y)
trialWeek(t=y,p=50)
[Package interim version 0.8.0 Index]