transmission_capacity_FI_to_RUS {finnishgrid}R Documentation

Transmission capacity FI-RUS

Description

Check https://data.fingrid.fi/en/dataset/summakapasiteetti-fi-rus

Usage

transmission_capacity_FI_to_RUS(start_time = NA, end_time = NA, user_key = NA)

Arguments

start_time

Start time in UTC with offset. Character array in ISO8601, YYYY-MM-ddTHH:mm:ssZ

end_time

End time in UTC with offset. Character array in ISO8601, YYYY-MM-ddTHH:mm:ssZ

user_key

Character array holding API-key. Free from https://data.fingrid.fi/open-data-forms/registration/

Value

A data frame object that contains the total commercial transmission capacity of the 400 kV transmission lines from Finland to Russia owned by Fingrid. The technical capacity on 400 kV lines from Russia to Finland is 1400 MW or 1000 MW, depending whether the NWPP power plant that is located in St. Petersburg area is connected to the Finnish or the Russian power system. Fingrid has reserved 100 MW of transmission capacity from Russia to Finland to buy reserve power. The technical maximum capacity from Finland to Russia is 350 MW, of which Fingrid has reserved 30 MW to buy reserve power.

Examples

## Not run: 
library(finnishgrid)
start = "2021-01-01T00:00:00+0200"  # UTC+2 offset, Helsinki time
end = "2021-01-10T00:00:00+0200"    # UTC+2 offset, Helsinki time
key = "MY_SUPER_SECRET"
df <- transmission_capacity_FI_to_RUS(start_time = start,
    end_time = end,
    user_key = key)
summary(df)

## End(Not run)

[Package finnishgrid version 0.1.0 Index]