powersys_trans_FI_EE_RTD {finnishgrid} | R Documentation |
Transmission between Finland and Estonia - real time data
Description
Power transmission between Finland and Estonia HVDC tie lines (Estlink 1 and Estlink 2). Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland. The data is updated every 3 minutes.
Usage
powersys_trans_FI_EE_RTD(start_time_utc = NA, end_time_utc = NA, user_key = NA)
Arguments
start_time_utc |
Start time in UTC. Character array YYYY-MM-ddTHH:mm:ss.sssZ |
end_time_utc |
End time in UTC. Character array YYYY-MM-ddTHH:mm:ss.sssZ |
user_key |
Character array holding API-key. Free from https://data.fingrid.fi/en/instructions |
Value
A data frame object with time series data having period 3 min and unit type MW.
See Also
https://data.fingrid.fi/en/datasets/180
Examples
## Not run:
library(finnishgrid)
start = "2024-06-01T00:00:00.000Z" # UTC
end = "2024-06-03T00:00:00.000Z" # UTC
key = "MY_SUPER_SECRET"
df <- powersys_trans_FI_EE_RTD(start_time_utc = start,
end_time_utc = end,
user_key = key)
summary(df)
## End(Not run)
[Package finnishgrid version 0.2.0 Index]