calc_annual_flow_timing {fasstr} | R Documentation |
Calculate annual timing of flows
Description
Calculates the timing (day of year and date) of portions of total annual flow of daily flow values from a daily streamflow data set. Calculates statistics from all values from complete years, unless specified. Returns a tibble with statistics.
Usage
calc_annual_flow_timing(
data,
dates = Date,
values = Value,
groups = STATION_NUMBER,
station_number,
percent_total = c(25, 33.3, 50, 75),
water_year_start = 1,
start_year,
end_year,
exclude_years,
months = 1:12,
transpose = FALSE
)
Arguments
data |
Data frame of daily data that contains columns of dates, flow values, and (optional) groups (e.g. station numbers).
Leave blank or set to |
dates |
Name of column in |
values |
Name of column in |
groups |
Name of column in |
station_number |
Character string vector of seven digit Water Survey of Canada station numbers (e.g. |
percent_total |
Numeric vector of percents of total annual flows to determine dates. Default |
water_year_start |
Numeric value indicating the month ( |
start_year |
Numeric value of the first year to consider for analysis. Leave blank or set well before start date (i.e.
|
end_year |
Numeric value of the last year to consider for analysis. Leave blank or set well after end date (i.e.
|
exclude_years |
Numeric vector of years to exclude from analysis. Leave blank or set to |
months |
Numeric vector of months to include in analysis. For example, |
transpose |
Logical value indicating whether to transpose rows and columns of results. Default |
Value
A tibble data frame with the following columns:
Year |
calendar or water year selected |
DoY_'n'pct_TotalQ |
day of year for each n-percent of total volumetric discharge |
Date_'n'pct_TotalQ |
date (YYYY-MM-DD) for each n-percent of total volumetric discharge |
Default columns:
DoY_25pct_TotalQ |
day of year of 25-percent of total volumetric discharge |
Date_25pct_TotalQ |
date (YYYY-MM-DD) of 25-percent of total volumetric discharge |
DoY_33.3pct_TotalQ |
day of year of 33.3-percent of total volumetric discharge |
Date_33.3pct_TotalQ |
date (YYYY-MM-DD) of 33.3-percent of total volumetric discharge |
DoY_50pct_TotalQ |
day of year of 50-percent of total volumetric discharge |
Date_50pct_TotalQ |
date (YYYY-MM-DD) of 50-percent of total volumetric discharge |
DoY_75pct_TotalQ |
day of year of 75-percent of total volumetric discharge |
Date_75pct_TotalQ |
date (YYYY-MM-DD) of 75-percent of total volumetric discharge |
Transposing data creates a column of 'Statistics' (just DoY, not Date values) and subsequent columns for each year selected.
References
Barnett, T.P., Pierce, D.W., Hidalgo, H.G., Bonfils, C., Santer, B.D., Das, T., Bala, G., Wood, A.W., Nozawa, T., Mirin, A.A., Cayan, D.R., Dettinger, M.D., 2008. Human-Induced Clanges in the Hydrology of the Western United States. Science 319, 1080-1083.
Examples
# Run if HYDAT database has been downloaded (using tidyhydat::download_hydat())
if (file.exists(tidyhydat::hy_downloaded_db())) {
# Calculate annual flow timings with default percent of annual totals
calc_annual_flow_timing(station_number = "08NM116")
# Calculate annual flow timings with custom percent of annual totals
calc_annual_flow_timing(station_number = "08NM116",
percent_total = 50)
}