hidd.seq {ctbi} | R Documentation |
hidd.seq
Description
similar to seq, except that when 'from' starts the 29, 30 or 31 of a month, seq2 adds 5 days to 'from', run seq, and then subtracts 5 days to the output. This is done because the function seq is not consistent when time series start at the end of the months.
Usage
hidd.seq(
from = 1,
to = 1,
by = ((to - from)/(length.out - 1)),
length.out = NULL
)
Arguments
from , to |
the starting and (maximal) end values of the sequence. Of length 1 unless just from is supplied as an unnamed argument. |
by |
number: increment of the sequence. |
length.out |
desired length of the sequence. A non-negative number, which for seq and seq.int will be rounded up if fractional. |
Value
a vector of same class than from
[Package ctbi version 2.0.5 Index]