C_it {XRSCC} | R Documentation |
Iteration of c control chart for attributes
Description
Calculates the iteration i'th, for the control limits of c chart using the results obtained in c_gr
and previous C_it
iteration.
Usage
C_it(prev.results)
Arguments
prev.results |
Its a list of previous results obtained by the |
Value
in.control |
The under control row list for the c chart |
out.control |
The out of control row list for the c chart |
Iteraciones |
The number of iterations, It is assumed to be the second or later |
data.0 |
The original data frame or vector |
data.1 |
The under control subset after iteration |
bin |
The binary values for out of control equal to one and under control equal to zero |
Limites de Control Grafica \emph{c} |
The c chart control limits vector |
Conclusion del proceso |
The same results in a phrase as the bin values |
Author(s)
Erick Marroquin
References
Montgomery, D.C. (2005) Introduction to Statistical Quality Control, 5th ed. New York: John Wiley & Sons, ISBN 0-471-65631-3
See Also
p_gr
, np_gr
, u_gr
, c_gr
, P_it
, NP_it
, U_it
Examples
data(clothes)
r1<-c_gr(clothes)
r2<-C_it(r1)
r3<-C_it(r2)