Simulate the failures, expansion, rehabilitation, and costs of a network
Description
Simulates failures, expansion, rehabilitation, and costs of a water supply pipe network. The simulation is stochastic.
Usage
simulate_network(n.years, expansion, rehabilitation, prob.failure,
income = 0, initial.budget = Inf, initial.inventory = NULL,
free.expansion = TRUE)
Arguments
n.years |
number of years to simulate |
expansion |
either a scalar describing the number of pipes added
every year to expand the pipe network, or a vector of length |
rehabilitation |
a (combination of) rehabilitation strategy function(s). See details below. |
prob.failure |
a function describing the probability of a pipe failing in the next year given its age, number of previous failures, and the age at the last failure (if any). |
income |
either a scalar describing the annual income, or a vector of length |
initial.budget |
initial budget |
initial.inventory |
if it is an integer it specifies the
number of initial pipes, or alternatively it can be a |
free.expansion |
if |
Details
The rehabilitation is defined by combining different simple replacement strategies.
See the example for how this can be done using the mystrategy
function input.
If the strategies vary over time, see initiate.network
and
simulate_network.period
.
The failure behavior is defined by the function prob.failure
.
It calculates the probability of a pipe failing within the next year based on pipe age,
pipe age at the last failure, and the number of failures. Note, the model
makes the assumption that a pipe cannot fail more than once per year.
The costs are calculated as a function of the pipe diameter, assuming all pipes have a length of 100 meters.
Value
an updated state list
Author(s)
Andreas Scheidegger
See Also
For more fine-grained control see initiate.network
and simulate_network.period
. Different replacement strategies
are implemented: replace.n.highest.risk
,
replace.n.oldest
, replace.n.random
, replace.older.than
,
replace.more.failures.than
, do.nothing
.
Examples
## -----------
## define model parameters
## Define the annual probability of a failure
prob.failure.exp <- function(age, age.last.failure, n.failure) {
if(n.failure==0){
return(1/30)
} else {
return(1/10)
}
}
## define a complicated (and probably useless) rehabilitation strategy
mystrategy <- . %>%
replace.n.highest.risk(n=2, prob.failure=prob.failure.exp) %>%
replace.more.failures.than(failures=5) %>%
replace.older.than(age=70, max.cost=2e6) %>%
replace.n.oldest(n=3) %>%
replace.n.random(n=2)
## This means: every year (if we have enough budget!), replace first the 2 pipes
## with the highest risk, then all pipes with more than 5 failures,
## then all pipes older then 70 years (up to costs of 2e6), then the 3
## oldest pipes remaining, and finally replace 2 randomly selected pipes.
## -----------
## run the simulation
result <- simulate_network(
n.years = 100, # run it for 100 years
expansion = 10, # build 10 pipes per year (if money is available)
rehabilitation = mystrategy, # use the strategy defined above
prob.failure = prob.failure.exp, # use the probability function defined above
income = 1e6, # the annual income
initial.budget = 1e7,
initial.inventory = 50, # start the simulation with 50 new pipes
free.expansion = FALSE
)
## look at some results
## str(result)
## str(result$time.100)