replace.n.highest.risk {WaMaSim} | R Documentation |
Rehabilitation strategy: replace the n
pipes with the highest risk
Description
Strategy to prioritize pipes with the highest risk. Pipes are only replaced if the budget remains positive.
Usage
replace.n.highest.risk(state, n, prob.failure, max.costs = Inf)
Arguments
state |
a state list |
n |
number of highest risk pipes to replace |
prob.failure |
failure rate function. Typically the same as passed to |
max.costs |
maximal amount of money allowed to be spent on this strategy |
Details
The risk is defined as the product of the failure probability in the next year and the expected failure costs.
Value
a state list
Author(s)
Andreas Scheidegger
See Also
replace.n.oldest
, replace.n.random
,
replace.older.than
,
replace.more.failures.than
, do.nothing
Examples
## define a strategy function that can be passed to simulate_network():
mystrategy <- . %>% replace.n.highest.risk(n=2, prob.failure=prob.failure.exp, max.costs=30000)
## or define a more complex strategy by combining multiple strategies
## into a prioritized sequence:
mystrategy <- . %>%
replace.more.failures.than(failures=2) %>%
replace.n.oldest(n=3) %>%
replace.n.highest.risk(n=2, prob.failure=prob.failure.exp) %>%
replace.older.than(age=8) %>%
replace.n.random(n=4)
[Package WaMaSim version 1.0.0 Index]