LWdata_EventStudy {HonestDiD} | R Documentation |
Event study estimates from baseline female specification on employment in Lovenheim & Willen (2019). See discussion in Section 6.2 of Rambachan & Roth (2021).
Description
This list contains the event study estimates from the baseline female specification on employment in Lovenheim & Willen (2019). See discussion in Section 6.2 of Rambachan & Roth (2021).
Format
A list, containing 7 objects:
- betahat
Vector of estimated event study coefficients.
- sigma
Estimated variance-covariance matrix.
- timeVec
Vector that contains the time periods associated with the event study coefficients.
- referencePeriod
Reference period that is normalized to zero.
- prePeriodIndices
Vector containing elements of timeVec that correspond to the pre-periods.
- postPeriodIndices
Vector containing elements of timeVec that correspond to the post-periods.
- stdErrors
Vector of standard errors associated with estimated event study coefficients
[Package HonestDiD version 0.2.6 Index]