paretocp {ERPeq}R Documentation

Probabilistic estimation of earthquake recurrence interval using Pareto distribution

Description

Computes the probability of an earthquake within a specified time "r" and elapsed time "te".

Usage

paretocp(fit, r, te)

Arguments

fit

Fit is the fitpareto object. See ?fitpareto for details.

r

The specified time in which the probability of an earthquake is desired to be calculated.

te

Elapsed time since the last earthquake

Value

A numeric value

References

Pasari, S. and Dikshit, O. (2014). Impact of three-parameter Weibull models in probabilistic assessment of earthquake hazards. Pure and Applied Geophysics, 171, 1251-1281.

Examples

library(VGAM)
data=VGAM::rpareto(200,2,5)
fit=fitpareto(c(0.5),data=data)
paretocp(fit,r=2,te=5)

[Package ERPeq version 0.1.0 Index]