safety_cof_pillar_04kv {CNAIM} | R Documentation |
Safety cost of Failure for 0.4kV Pillar
Description
This function calculates safety consequences of failure
(cf. section 7.3, page 79, CNAIM, 2021). Safety consequences
of failure is used in
the derivation of consequences of failure see cof
().
Outputted in DKK
Usage
safety_cof_pillar_04kv(location_risk, type_risk)
Arguments
location_risk |
String Type Financial factor criteria for 0.4kV Pillar
(cf. section D1.2.1, page 178, CNAIM, 2021).
Options: |
type_risk |
String. Asses Financial factor criteria for 0.4kV Pillar
setting (cf. table 221, page 180, CNAIM, 2021).
Options: |
Value
Numeric. Financial consequences of failure for 0.4kV Pillar
Source
DNO Common Network Asset Indices Methodology (CNAIM), Health & Criticality - Version 2.1, 2021: https://www.ofgem.gov.uk/sites/default/files/docs/2021/04/dno_common_network_asset_indices_methodology_v2.1_final_01-04-2021.pdf
Examples
safety_cof_pillar_04kv(
location_risk = "Default",