network_cof_lv_ugb {CNAIM} | R Documentation |
Network cost of Failure for LV UGB
Description
This function calculates network cost of failure for
all asset categories exclusive the assets EHV and 132kV transformers.
(cf. section 7.6, page 87, CNAIM, 2021). Network cost of failure
is used in the derivation of consequences of failure see cof
().
Usage
network_cof_lv_ugb(
lv_asset_category,
no_customers,
kva_per_customer = "Default"
)
Arguments
lv_asset_category |
String The type of LV asset category
Option: |
no_customers |
Numeric. The number of customers fed by an individual asset. |
kva_per_customer |
Numeric. If the asset have an exceptionally high
demand per customer type in kVA per customer. A setting of |
Value
Numeric. Network cost of failure.
Source
DNO Common Network Asset Indices Methodology (CNAIM), Health & Criticality - Version 2.1, 2021: https://www.ofgem.gov.uk/sites/default/files/docs/2021/04/dno_common_network_asset_indices_methodology_v2.1_final_01-04-2021.pdf
Examples
network_cof_lv_ugb(lv_asset_category = "LV UGB",
no_customers = 750, kva_per_customer = 51)